Team

New baby news!

Our marketing consultant Alexandria Monk and her partner Si welcomed a beautiful baby girl to their family at the end of November. Evelyn was born a casual 17 days late, weighing in at a hefty 9lbs 3oz! She joins two older siblings in the household, both of whom are completely smitten with her. Alex will…

April 2015 Progress Update

The Green Build Hub is well on the way to completion now with the local cedar cladding completed, floor insulation and under floor heating laid, monitoring sensors installed and the Cornish rockers installed. The design team are now discussing final finishes such as floor finishes and colours in partnership with Falmouth University Interior design and…

January 2015 Progress Update

Things are moving very quickly here at the Green Build Hub site at the moment. The roof glulam beams are now on with the plywood roof decked and the concrete stairs have been installed. The scaffolding is just about keeping up with the build and is nearly complete. The contractors have been battling the weather…

GBH team attend NEC 3 Workshops

   CSBT have put on two New Engineering Contract 3 Workshops which involved all parties of our GBH team. The workshops help highlight any confusion or potential problems with the proposed contract. The key members of the project are working under the NEC 3 Engineering and Construction Contract which promotes mutual trust and co-operation.  …

Green Build Hub Team Run Eden Half Marathon

  Green Build Hub Team: (left to right, front to back) Phil Crossley, Stewart Bradley, Dan Cole, Simon French, Darrell Wilcock, Paul Treweek, David Edmondson, Simon Caklais, Jason Tetlow (below) Cian Spowart, Jacob Down. What can we say? CSBT is beaming with pride after a marvellous display from our committed project team. Last Sunday 19th…